INSTALLATION, COMMISSIONING & SERVICING RECORD
TR05A140.B1107
COMMISSIONING PROCEDURE INFORMATION
For All Boilers
Has the system been flushed in accordance with the boiler manufacturer’s instructions? Yes
No
What cleanser was used?
Has an inhibitor been added? Yes
No
Which inhibitor was used?
For central heating mode, measure and record:
Heat Input kW
Burner Operating Pressure mbar
Central Heating Flow Temperature ºC
Central Heating Return Temperature ºC
For Combination Boilers Only
Has a water scale reducer been fitted? Yes
No
What type of scale reducer has been fitted?
For domestic hot water mode, measure and record:
Heat Input kW
Maximum Burner Operating Pressure mbar
Maximum Operating Water Pressure bar
Cold Water Inlet Temperature ºC
Hot Water Outlet Temperature ºC
Water Flow Rate at Maximum Setting l/min
For Condensing Boilers Only
Has the condensate drain been fitted in accordance with the manufacturer’s instructions? Yes
No
For All Installations
Does the heating and hot water system comply with the appropriate Building Regulations? Yes
Has the appliance and associated equipment been installed and commissioned in accordance with
the manufacturer’s instructions?
Yes
Have you demonstrated the operation of the appliance and system controls to the customer? Yes
Have you left all the manufacturer’s literature with the customer? Yes
Competent Person’s Signature Customer’s Signature
(To confirm demonstrations of equipment and receipt of
appliance instructions)