EasyManua.ls Logo

Weidmüller AC SMART VALUE Socket - Check List before Installation

Weidmüller AC SMART VALUE Socket
112 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preparing for installation
80
Operating instructions – AC SMART
7.4 Check list before installation
We recommend checking the following points before assembly and installa-
tion of the EV charging box:
The locally applicable assembly and installation regulations are known and
can be complied with.
The circuit breaker and residual current protective device are installed
according to the desired power rating and the installed cable lengths.
The required tools and materials are available.
The enclosed fastening materials have been checked and are suitable for
the intended installation location. If not, other suitable installation materials
are prepared.
The required lines and cables are available:
Power supply cable (possible cable diameters: 14 – 54 mm)
Signal cable and data cable (optional)

Table of Contents

Related product manuals