EasyManua.ls Logo

YOKOGAWA Centum VP - Page 3

YOKOGAWA Centum VP
253 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
i
TI 33J01J10-01EN
Introduction
The CENTUM VP is a distributed control system (abbreviated as DCS) for small to large
plants.
This manual describes the requirements for installation (control room size and power
supply requirements), storage and transportation, and wiring.
Chapter 1 System Installation Requirements


and list of consumable parts, see Chapter 4.
Chapter 2 Transportation, Storage and Installation
This chapter describes precautions in transit, unpacking and storage, such as humidity,

Chapter 3 Cabling
This chapter describes how to connect power, ground, signal and bus cables to the installed



ratings, and parts that need replacement within 10 years. Read this section when deciding power
supply capacity.

This chapter describes items that must be checked before applying power and the precautions to


Mar. 6, 2015-00

Table of Contents

Related product manuals