EasyManua.ls Logo

Zebra CC6000 - Getting Started; Unpacking

Zebra CC6000
151 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
Getting Started
Introduction
This chapter provides information for getting the device up and running for the first time.
Unpacking
1. Carefully remove all protective material from the device and save the shipping container for later
storage and shipping.
2. Verify that the following are included:
CC600 or CC6000 interactive kiosk.
Regulatory Guide.
CC600 only: Ferrite bead for EMI. Attaches to the DC power module.
3. Inspect the equipment for damage. If any equipment is missing or damaged, contact the Global
Customer Support center immediately.
4. Prior to using the device for the first time, remove the protective shipping film that covers the
display.

Table of Contents

Related product manuals