EasyManua.ls Logo

Zero SR/S

Zero SR/S
290 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Power Pack
Power Pack 20-15
20
Installation
1. Installation is the reverse of removal
procedure except for the following:
2. Make sure foam is located on top of BMU. This
will reduce vibration.
3. Insert BMU at an angle to engage rear clips.
4. Apply vertical pressure and push BMU
rearwards to fully engage front grommets.
Power Pack Battery Signal Harness
[Before 2022MY]
Tools Required (includes tools required for
parent jobs):
T20
T25
T27
T30
T40
3/16” standard screwdriver
2mm hex wrench
7mm combination wrench
10mm socket and ratchet
14mm socket
22mm 6-point socket
Non-marring trim removal/pry tool
O-ring pick
Scissor jack
Ratchet straps (x2)
Hoist
Zero Motorcycles Specialty Tools Required
(includes tools required for parent jobs):
Power Pack fixture
New Seals Required:
Controller cable seals (quantity: 5)
Controller cable O-rings (quantity: 5)
New Fasteners Required:
Cable ties (quantity: 6)
Double loop cable tie (quantity: 1)
Self amalgamating tape

Table of Contents

Related product manuals