EasyManua.ls Logo

Zero SR/S

Zero SR/S
290 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Charging System
Chargers 25-15
25
CAUTION: Cover/protect battery terminal
eyelet to reduce the risk of accidentally
contacting the negative battery terminal,
which can inadvertently power up the
12 volt system and damage components.
CAUTION: Secure battery terminal wire to
reduce the risk of arcing and damaging
electrical components.
4. Remove headlight upper fairing. See
Headlight Upper Fairing, page 60.2.
5. Remove left and right outer side fairings. See
Side Fairings (Outer), page 60.14.
6. Remove left and right inner side fairings. See
Side Fairings (Inner), page 60.19.
7. Remove tank assembly. See Tank Removal,
page 60.10.
8. Remove mid pack protection unit.
9. Remove T30 bolts (x2) securing tank unit to
bike frame. Torque 2.5 lb-ft (3.5 Nm).
10. Move bucket to the right side of the bike.
11. Disconnect charge inlet harness connector.
12. Disconnect battery signal harness connector.
13. Remove T30 bolts (x4) securing charging
plug. Torque 8 lb-ft (11 Nm).
14. Remove zip ties securing harness to frame.
15. Remove T30 bolt securing ground straps (x3).
Torque 5 lb-ft (7 Nm).
Note: Stack crimp side up for best contact.
16. Remove T25 bolts (x4) securing HCU cover to
frame. Torque 3.5 ft-lbs (5 Nm).
17. Remove shroud.

Table of Contents

Related product manuals