SWT
GIGABIT/FAST ETHERNET SWITCH TYPE SWT 16/137
USER GUIDE - M0SWTA1903Iv09 - V09 March 2019
1.5 WARNINGS
1.5.1 Warnings before installing
1. The installation of the SWT in Electrical Substations or Secondary
Substations is generically subject to the fulfilment of all the safety measures
and prevention of risks established for this type of work by the electricity
company that will use these devices and the Safety standards (EN 50110).
2. In order to install and handle the SWT the following points must be
complied with:
- Only qualified personnel appointed by the electricity company that owns
the installation should carry out the installation and handling of the SWT.
- The environment in which it is to operate should be suitable for the SWT,
fulfilling all the conditions indicated in section 1.4.8.
3. ZIV will not accept responsibility for any injury to persons, installations or third
parties, caused by the non-fulfilment of points 1 and 2.