EasyManua.ls Logo

3M Edge eg5 - Running Studies; Starting a Noise Study

3M Edge eg5
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Running studies
Starting a run
34
Running studies
With a couple pushes on the keypad buttons, you will be running and viewing your study (ies). Following
your study (ies), you can load the data/files into DMS to manipulate, analyze, save, and create reports (See
Chapter 5 for viewing your logged data in DMS).
Starting a run
How to run a noise study
1. If your dosimeter is turned off, press the button to power on.
2. Press and hold the button.
A 3, 2, 1 countdown will appear.
3. When running, the following will appear:
A run indicator will appear on the top-right side.
The LED indicator will flash green (unless you disabled this in DMS.)
Figure 4-8: Display screen while running
Run indicator
Appears when running
Battery indicator
Flashing green LED
indicates running
Measurements
Use up/down arrow
to move through
values.
Views are
customizable via
DMS setup

Table of Contents

Related product manuals