Introduction to the manual 19
Unpack and check the units.
Check that all necessary optional modules and
equipment are present and correct.
Only intact units may be started up.
Mechanical installation (page 43)
If the drive module has been non-operational for
more than one year, the converter DC link
capacitors need to be reformed. Ask ABB for
instructions.
Check the installation site. Ambient conditions (page 116)
Fasten the base of the cabinet to floor. Install the drive
module into the cabinet.
Mechanical installation (page 43)
Route the cables. Routing the cables (page 60)
Check the insulation of the supply cable, the motor and
the motor cable.
Checking the insulation of the assembly (page 71)
Connect the power cables.
Connect the control and the auxiliary control cables.
Connecting the power cables (page 73),
Connecting the control unit to the drive module
(page 79), Connecting the control cables (page
80)
Manuals for any optional equipment
Check the installation. Installation checklist (page 89)
Commission the drive. Start-up (page 93)
Operating of the drive: start, stop, speed control etc. ACQ810-04 quick start-up guide, ACQ810 pump
control program firmware manual
Task See