Mechanical installation 45
Moving and unpacking the unit
Move the transport package by pallet truck to the installation site.
The layout of the transport package is shown below.
Unpack the package as follows:
Cut the bands (A).
Unpack the additional boxes (B).
Remove the sheathing by lifting it (C).
Fasten lifting hooks to the drive module lifting eyes (D) and lift the module to the
installation place.
Checking the delivery
Check that all items listed under section Moving and unpacking the unit are present.
Check that there are no signs of damage. Before attempting installation and operation,
check the information on the type designation label of the drive to verify that the unit is of
the correct type.
1
2
3
4
5
B
B
C
Part no. Description
1 Drive module with factory
installed options and multilingual
residual voltage warning sticker
2 Output cable terminals with
fastening screws
3 Floor fastening brackets and PE
terminals with screws
4 Control unit with control panel
and control cable clamp plate,
control panel option (+J410)
and factory installed optional
modules
Delivery documents
Printed Quick start-up guide
and manuals CD
5 Sheathing
6 PP cushion
7Pallet
6
6
6
7
A
D
6
A
A
A