Installation checklist 89
Installation checklist
What this chapter contains
This chapter contains a list for checking the mechanical and electrical installation of the
drive.
Go through the checklists below together with another person. Follow the Safety
instructions on the first pages of this manual.
Mechanical installation
Cabinet construction
Checks for cabinet construction are listed below.
1 Cabinet construction
1.1 Frame, wall, floor and roof structures, busbar enclosures and cable entries are correct and completely
assembled.
1.2 The drive module is fastened properly to the cabinet. (See Planning the cabinet installation and
Mechanical installation.)
1.3 Mechanical joints are tightened and not broken.
1.4 Parts are clean and painted surfaces not scratched.
The cabinet frame and parts which are in metal to metal contact with the frame (for example seams,
component fixing points on assembly plates, back of control unit mounting plate) are not finished with
non-conducting paint or material.
1.5 Degree of protection (IPxx)
1.6 There is a sufficient number of supports, bolts and nuts for cables.