EasyManua.ls Logo

ABB ACS5000 - Preparing Cables for Cable Entries with Sealing Modules

ABB ACS5000
186 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3BHS799208 E01 REV E ACS5000 WATER-COOLED USER MANUAL 107/186
06 ELECTRICAL INSTALLATION
6.7.1.3 Preparing cables for cable entries with sealing modules
Prepare cables with an outer cable screen or shield for EMC bonding
with the metal enclosure of the cabinet as illustrated.
Figure 6-14 Preparing power cables for sealing modules
Install the sealing modules according to the instructions of the
sealing module supplier.
(1) Sealing module
(2) Frame
(3) Conductive foil of sealing module
(4) Cable clamp
(5) Shrinkable sheath seal
(6) Heat-shrinkable termination
(7) Outer cable sheath
(8) Cable sheath removed to expose
cable shield
(9) Shield extension to be connected
to PG busbar
(10) Cable screen extension to be
connected to the PG busbar
(11) Cable lug as specified by the cable
supplier and suitable for M12 bolt
(12) Sheath seal
1
2
3
4
5
6
7
8
9
10
11
12

Table of Contents

Related product manuals