5. Mechanical installation
5.1 Safety
5.2 Overview on installation work
The drive is delivered in transport units that must be joined and fixed to 
the floor at the installation site.
The installation includes the following work:
• “5.5 Preparing the installation site” on page 75
• “5.6 Aligning transport units” on page 75
• “5.7 Joining transport units” on page 77
• “5.8 Applying silicone” on page 78
• “5.9 Installing roof joints” on page 78
• “5.10 Installing roof-mounted cooling units” on page 79 (option)
• “5.11 Installing roof attachments” on page 84 (option)
• “5.12 Joining water pipes” on page 86
• “5.13 Joining busbars” on page 87
• “5.14 Connecting the heating cable” on page 89 (option)
• “5.15 Connecting raw water pipes” on page 90
• “5.16 Fixing the drive to the floor” on page 90
All installation work must be carried out by qualified personnel according 
to the site and equipment requirements and in compliance with 
local regulations.