EasyManua.ls Logo

ABB IRB 1300 - Page 215

ABB IRB 1300
770 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Removing the base
Use these procedures to remove the base.
Preparations before removing the base
NoteAction
Decide which calibration routine to use, and take
actions accordingly prior to beginning the repair
procedure.
1
xx2000001520
Jog all axes to zero position.2
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the safeguarded
space.
3
CAUTION
For robots with protection type Clean Room
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See Cut the paint or surface on the robot before
replacing parts on page 145.
4
Draining oil of axis-1 gearbox
NoteAction
WARNING
Handling gearbox oil involves several
safety risks, see Gearbox lubricants (oil or
grease) on page 29.
1
Continues on next page
Product manual - IRB 1300 215
3HAC070390-001 Revision: G
© Copyright 2020-2022 ABB. All rights reserved.
5 Repair
5.4.1 Replacing the base
Continued

Table of Contents

Related product manuals