EasyManua.ls Logo

ABB IRB 1300 - Page 476

ABB IRB 1300
770 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
O-ring on tubular: 3HAC061327-
018
xx2000002519
For robots with protection class IP67 (option
3350-670)
For robots with protection type Clean Room
(option 3351-4)
For robots with protection type Foundry Plus
(option 3352-10)
Check the O-ring.
Replace if damaged.
2
Screw: M4x25 12.9 Lafre
2C2B/FC6.9 (12 pcs)
Refit the tubular and tilt unit to the extender unit.3
Tightening torque: 3.8 Nm
xx2000001739
xx2000001742
Make sure that the notches on the extender unit
and tubular are aligned.
4
Refitting the axis-6 motor
NoteAction
For robots with protection type Clean Room:1
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free.
Check that:
all assembly surfaces are clean and without
damages
the motor is clean and undamaged.
2
Continues on next page
476 Product manual - IRB 1300
3HAC070390-001 Revision: G
© Copyright 2020-2022 ABB. All rights reserved.
5 Repair
5.5.3 Replacing the tubular and tilt unit
Continued

Table of Contents

Related product manuals