EasyManua.ls Logo

ABB IRB 1300 - Page 549

ABB IRB 1300
770 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
xx2000001593
Remove the tubular covers.3
Loosening the process hub
NoteAction
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
CAUTION
For robots with protection type Clean Room
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See Cut the paint or surface on the robot before
replacing parts on page 145.
2
xx2000001538
Remove the screws and carefully open the cover.
CAUTION
There is cabling attached to the cover. The cover
cannot be removed completely.
3
Loosening the cables in the tubular
NoteAction
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
Continues on next page
Product manual - IRB 1300 549
3HAC070390-001 Revision: G
© Copyright 2020-2022 ABB. All rights reserved.
5 Repair
5.6.5 Replacing the axis-5 motor
Continued

Table of Contents

Related product manuals