EasyManua.ls Logo

ABB IRB 1300 - Page 553

ABB IRB 1300
770 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
xx2000001537
Snap loose and remove the male head of the
connectors from the connector plate.
4
Removing the axis-5 timing belt
NoteAction
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
CAUTION
For robots with protection type Clean Room
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See Cut the paint or surface on the robot before
replacing parts on page 145.
2
CAUTION
Loosening timing belts will release axes. This
means the axes can fall down.
Make sure axes are well supported before
loosening timing belts.
3
xx2000001594
Loosen the screws and move the motor slightly
to slacken the timing belt.
4
Continues on next page
Product manual - IRB 1300 553
3HAC070390-001 Revision: G
© Copyright 2020-2022 ABB. All rights reserved.
5 Repair
5.6.5 Replacing the axis-5 motor
Continued

Table of Contents

Related product manuals