24 Introduction to the manual
Quick installation and start-up flowchart
Task See
Plan the electrical installation and acquire
t
he accessories needed (cables, fuses,
etc.).
Check the ratings, required cooling air
f
low, input power connection,
compatibility of the motor, motor
connection, and other technical data.
Planning the electrical installation
(page 41)
Cooling and degrees of protection
(page 36)
Technical data (page 147)
Check the installation site. Cabinet construction
(page 36)
Unpack and check the units (only intact
units may be started up).
Check that all necessary optional
mo
dules and equipment are present and
correct.
Mount the drive.
Contents of the package (page 34)
Installation procedure (page 39)
Route the cables. Routing the cables (page 47)
Check the insulation of the supply cable,
the motor and the motor cable.
Checking the insulation of the assembly
(page 50)
Connect the power cable.
Connect the motor cable.
Connect the control cables.
Power cable connection (page 51)
Electrical installation: input / output
(page 59)
Check the installation. Installation checklist (page 91)
Start the drive. Start-up (page 93)