EasyManua.ls Logo

ABB PCS100 AVC-20 - Repairs

ABB PCS100 AVC-20
126 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
100 PCS100 AVC-20 User Manual
Schedule of component replacement for product operation in environmental conditions up to 40° C
Years from start-up
Component
Note
5
10
Cooling
PCS100 power module fan
R
R
Aging
CANbus cable replacement*
R
AC filter capacitors **
R
Auxiliary module power supply
R
R
SCM board
SCM rev F and earlier, systems built
before 18/6/2015
R
SCM board battery
SCM rev G and later, systems built
after 18/6/2015
R
Schedule of component replacement for product operation in environmental conditions up to 30° C
Years from start-up
Component
Note
5
10
Cooling
PCS100 power module fan
R
R
Aging
CANbus cables replacement*
R
AC filter capacitors **
R
Auxiliary module power supply
systems built before 31/7/2017
R
R
Auxiliary module power supply
systems built after 31/7/2017
R
SCM board
SCM rev F and earlier, systems built before
18/6/2015
R
SCM board battery
SCM rev G and later, systems built after
18/6/2015
R
If for any reason there is the need to replace a module from year 8 onward, we recommend that the opportunity is
taken to replace the CAN bus cables at this time.
** Valid for THD
V
<8%. For THD
V
>8% components’ lifetime is likely to be reduced.
Consult ABB Service for maintenance recommendations at: NZ-powerconditioningservice@abb.com
12.2 Repairs
All repairs must be performed by ABB Service or an authorized service agent. When contacting ABB Service please
provide the serial number of the PCS100 AVC-20 and a copy of the Service Log which can be downloaded via the
Web pages as described in section 10.2.6.

Table of Contents

Related product manuals