Operation Manual / Power2 850-M / 4.1 Low-pressure stage
Page 19 /
© Copyright 2015 ABB. All rights reserved.
4.7 Removing the compressor casing
Figure 10: Removing the compressor casing 1
1. Remove two studs (72002) and screw (72021) in the upper area.
2. Fit bracket (90030) with four screws (90959).
3. Fit four plates (90031) and secure with plate (90032), screw (90656) and nut (90432).
Figure 11: Removing the compressor casing 2
4. Secure lifting gear to swivel lifting eye (90231) and secure compressor casing (72000) to
crane.
5. Loosen and remove nuts (61037).
6. Press off compressor casing (72000) with three press-off screws (90924).
7. Move out and put down compressor casing (72000).