Operation Manual / Power2 850-M / 4.1 Low-pressure stage
Page 31 /
© Copyright 2015 ABB. All rights reserved.
Figure 27: Installing the wall insert 2
50 Nm
Table 13: Tightening torque (72002)
1. Remove plate (90032), screw (90656), nut (90432) and plates (90031).
2. Remove the bracket (90030).
3. Detach speed measurement cable from provisional holder and insert cable connector
(86515).
4. Screw in and tighten four studs (72002) in the upper area.