EasyManua.ls Logo

ABB REL650 - Page 177

ABB REL650
516 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
~ ~
Z
A
Z
B
Z
L
A B
IED
I
fB
Fault
ANSI09000022-1-en.vsd
ANSI09000022 V1 EN
Figure 78: Through fault current from A to B: I
fB
Then a fault in A has to be applied and the through fault current I
fA
has to be calculated,
figure 79. In order to get the maximum through fault current, the minimum value for Z
B
and the maximum value for Z
A
have to be considered.
ANSI09000023-1-en.vsd
~ ~
Z
A
Z
B
Z
L
A B
IED
I
fA
Fault
ANSI09000023 V1 EN
Figure 79: Through fault current from B to A: I
fA
The IED must not trip for any of the two through-fault currents. Hence the minimum
theoretical current setting (Imin) will be:
Imin MAX I
fA
I
fB
,( )³
EQUATION78 V1 EN (Equation 94)
A safety margin of 5% for the maximum protection static inaccuracy and a safety margin
of 5% for the maximum possible transient overreach have to be introduced. An additional
20% is suggested due to the inaccuracy of the instrument transformers under transient
conditions and inaccuracy in the system data.
1MRK 506 334-UUS A Section 7
Current protection
171
Application manual

Table of Contents

Other manuals for ABB REL650

Related product manuals