For systems in which there are multiple power controllers, individual power
controllers are synchronized so that a regular mains load is achieved. This avoids
random load peaks caused by multiple power controllers switching on at the same
time. The upstream transformer and/or the upstream feed point can be designed for a
lower load, which results in savings in investment and operating costs, and much
smaller system perturbations.
dASM can be applied whenever multiple power controllers operate together on a
common grid supply in the TAKT mode. Other features include:
Grid load optimization for up to 32 power controllers in the TAKT mode
Grid load optimization on the basis of power consumption of the connected
loads
Dynamic grid load optimization, including the observance of setpoint or of the
load alterations
Digital operation and communication
Grid load optimization of the dASM group within up to 5 seconds
Suitable for 1-phase or 3-phase applications
Simple dASM wiring with shielded RJ-45 patch cables (Ethernet CAT 5 8-pole)
with a cable length between two power controllers of up to 100 m (328′)
depending on surrounding conditions
Simple parameterization of monitoring features in the master unit (including
configurable total power limit and number of devices)
Monitoring the grid load (power limit)
dASM Application Considerations
When designing and installing, ensure that the:
Electric load is evenly distributed onto the 3-phase system
Parameterization and initiation of the individual power controller devices are in
the TAKT mode with the same TAKT cycle period (To)
Power wiring is correct for the phases
1-phase and 3-phase loads are in separate dASM groups
Power controllers and loads of a dASM group are connected to the same grid in
phase
Shielded RJ-45 patch cables connect the dASM In and dASM Out connectors
of each unit
Remove a section of the outer cable jacket to expose the shield.
Place the exposed shield section of the cable under the shield clamp.
Plug the RJ-45 connector into the unit.
Advanced Energy
®
Thyro-PX
®
Power Controller
57010148-00G Installation, Setup, and Operation 5‑49

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Advanced Energy Thyro-PX Series and is the answer not in the manual?

Advanced Energy Thyro-PX Series Specifications

General IconGeneral
BrandAdvanced Energy
ModelThyro-PX Series
CategoryController
LanguageEnglish

Related product manuals