Instrument Installation 1
Step 4. Connect the Triple Quadrupole LC/MS
Agilent 6400 Series Triple Quad LC/MS System Installation Guide 19
Figure 10 Drain bottle
7 Install the gas filter(s):
For Triple Quadrupole LC/MSs without
AJS ESI source:
a Cut an appropriate length of the
1/4-inch PTFE gas tubing
(G1946-80078) and connect to the
nitrogen gas supply regulator or
nitrogen generator.
b Use the supplied nut and ferrule kit
(5183-0392) to attach the other
length of tubing to the RMSN-4 gas
filter. This configures the filter in
series with the supply tubing. See
Figure 11 as an example for
assembling the gas trap in the correct
configuration.
c Secure the gas filter in a vertical position. Use the supplied cable ties.
Spray chamber drain tube
Drain bottle vent
CDS inlet and LC waste fitting
Waste drain bottle
Secondary containment
(customer supplied)
Outlet to LC/MS
RMSN-4
Figure 11 Gas filter connected in
series
Inlet from nitrogen gas
source

Table of Contents

Other manuals for Agilent Technologies 6490

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 6490 and is the answer not in the manual?

Agilent Technologies 6490 Specifications

General IconGeneral
BrandAgilent Technologies
Model6490
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals