EasyManua.ls Logo

Agilent Technologies 7000 Triple Quadrupole GC/MS

Agilent Technologies 7000 Triple Quadrupole GC/MS
214 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
68 Troubleshooting and Maintenance Manual
3 CI Troubleshooting
Large peak at m/z 19
If the abundance of the peak at m/z 19 is more than half abundance of the
peak at m/z 17, then there is probably too much water in the system.
The system was not baked out sufficiently after it was last vented.
Bake out the system as described in Chapter 4, “General Maintenance” on
page 75.
Moisture left over in the reagent gas supply tubing and flow module
Purge the reagent gas supply lines for at least 60 minutes.
Contaminated reagent gas supply
Replace the reagent gas supply and purge the lines and flow module.
Saturated methane/isobutane gas purifier
Replace the gas purifier.

Table of Contents

Related product manuals