EasyManua.ls Logo

Alto-Shaam CT PROFORMANCE CTP6-10E

Alto-Shaam CT PROFORMANCE CTP6-10E
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MN-35947
Rev 15
01/18
Combitherm® CT PROformance™ and CT Classic Series Installation Manual
43
Installation
Power supply side
Appliance side
* For 1-phase appliances remove red wire and orange wire.
* For 1-phase appliances remove red wire and orange wire.
12mm
Note: Illustrations are representative only. Your appliance may vary.
Strip the wires, then connect them to the terminal strip.
Remove enough cable covering so that wires reach the terminal strip.
Depending on the application, install the straight or elbow fitting to the cable.
Cut threads into nut before installing fitting.
To do so, apply a light lubricant and thread
nut on and off fitting.
Cut threads into nut before installing fitting.To do so, apply a
light lubricant and thread nut on and off fitting.
Position and attach the support plate (x).
Discard the cover plate if applicable.
Install the fitting/wiring to the appliance.
1-1/2” NPT and smaller bushings through the
bottom, all others through the back.
Installation point for 1-1/2” NPT and smaller 90º bushings.
L1 L2 L3 N
PE
PE
L1 L2 L3 N
RD OR WH
GR
BK
BK WH GR
BK RD OR WH GR
A
A
B1
B1
2*
2*
1
1
1 2 3
3 4
3 4
5
5
B2
B2
1
2
4
6
3
International
Applications
x
x
x
L1 L2/N
PE
5
Route the wires.
Keep wires away from hot surfaces such as:
water tank, drain pipe, motor, edges of sheet
metal, vent pipes, or other appliances.
ELECTRICAL KIT INSTALLATION – 50 Hz

Table of Contents

Related product manuals