Installation Procedures: 17" Panels
69
  VG Series Modero Touch Panels 
6. Follow the procedures outlined within Steps 1 - 5 on page 34 thru page 36 to carefully reinstall the LCD panel back 
into the back box housing.
7. Carefully lay the separated LCD (from the main unit) onto a soft cloth resting on a level surface to prevent 
scratching of the LCD.
8. Insert the back box into the cutout to check for fit. Make any adjustments to the dimension of the cutout to 
accommodate the back box.
9. Cutout the notched beam (FIG. 58) using a height of 13.554" (34.43 cm) and a depth using the following guideline. 
This notched beam is located on the side of the NXD unit furthest away from the connectors. 
Calculate the distance from the edge of the mounting ridge (FIG. 58) to the rear point (on the box) where the 
beam touches the back box. Our example uses 1 3/8" (inches) (on the deepest point of the rear back box).
Calculate the thickness of the drywall/sheetrock. Our example uses 5/8" (inches).
The depth of the notch: 1 3/8" minus 5/8" = 6/8" (inches). This value reflects the cutout depth necessary for 
the mounting ridge on the back box to be flush against the surface.
 
10. Thread the incoming RJ-45, Ethernet, and any other audio/video wiring (from their terminal locations) through the 
cutout opening. Refer to the Wiring Guidelines for the 1700VG Panels section on page 74 for pinout descriptions. 
Leave enough slack in the wiring to accommodate any re-positioning of the panel.
11. Connect all data and power wiring connectors to their corresponding locations along the side of the (un-powered) 
NXD touch panel.
Verify the terminal end of the power cable is not connected to a power supply before plugging in the 2-pin 
power connector.
The USB connectors can be from either a USB extension cable, or a wireless USB RF transmitter.
12. Test the incoming wiring by attaching the panel connections to their terminal locations and applying power. Verify 
the panel is receiving power and functioning properly to prevent repetition of the installation.
FIG. 59  Wall Mount panel (NXD) installation using expansion clips
B - Main NXD unit consists of 
Install the four
 drywall clip
sets (included) into
the LCD panel and back box housing 
Four notches are
required if the
unit is installed in
drywall using the
four provided
drywall expansion
A - Faceplate
(bezel)
clips
Notching of one or more
stud beams may be
required if the unit is not
framed into the wall.
13.554"
(34.43 cm)
Mounting
Tab
these holes
The determining factor in the depth of the cut into the beam is the thickness of the 
drywall. The MOUNTING TAB MUST BE FLUSH against the drywall and therefore, 
the depth of the notch depends on that thickness.