Medium-consistency pump MC
STANDARD, C-01-000000
Rev. 0, 2010.02.09 ERECTION WORK and TRANSPORT Kap.4 , Seite 4 of 12
GRZ-2698569-v1-Erection.FM
Abb. 4-4 Haulage of the Exchange Unit
Abb. 4-5 Haulage of the Spiral Casing
DANGER
During transport of the medium-consistency pump or
loading/unloading (pump may fall).
Disregarding the directives above may cause danger for life and
limb!