EasyManua.ls Logo

Areva FLUOKIT M24+ - Operating the PGB Functional Unit; Opening the upstream and downstream earthing switches; Closing the load break switch

Areva FLUOKIT M24+
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
36
13 Operating the PGB Functional Unit
13.1 Opening the upstream and downstream earthing switches
F Using the right hand, turn the
padlockable button and
maintain it there.
F Insert the lever.
F Make the rod slide upwards
then grip the lever by both of its
extremities.
F Lower the lever towards the left.
F The earthing switches are now
open.
F Remove the lever.
13.2 Closing the load break switch
F Using the left hand, turn the
padlockable button and
maintain it there.
F Insert the lever.
F Make the rod slide upwards
then grip the lever by both of its
extremities.
F Lower the lever towards the
right.
F The switch is now closed.
F Remove the lever.

Table of Contents