EasyManua.ls Logo

Areva FLUOKIT M24+ - Closing the load break switch; Closing the circuit breaker; De-energizing a PGC Functional Unit

Areva FLUOKIT M24+
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
39
14.3 Closing the load break switch
F Using the left hand, turn the
padlockable button and
maintain it there.
F Insert the lever.
F Make the rod slide upwards
then grip the lever by both of its
extremities.
F Lower the lever towards the right.
F The switch is now closed.
F Remove the lever.
14.4 Closing the circuit breaker
F Lock the load break switch and
remove the key.
F The circuit breaker is locked in
the "tripped" position.
F Insert the key and turn it: The
circuit breaker is now unlocked.
F Using the crank handle, reset
the BLR mechanical control
mechanism.
F Turn the handling button to
close the circuit breaker.
F Circuit breaker closed, reset the
BLR so as to have a reserve of
energy available.
14.5 De−energizing a PGC Functional Unit
Proceed with operations in the
reverse order to those described in
§ 14.1 to 14.4.

Table of Contents