EasyManuals Logo

Associated Research hypot III 3670 User Manual

Default Icon
78 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #57 background imageLoading...
Page #57 background image
50
6. Instrument Verification
Verification is a process by which an instrument’s fail detectors are proven to be functioning
properly and thereby “Verifying” the functionality of the electrical safety tester and connected
accessories. Verification of failure detect circuitry of the electrical safety tester is required by
safety agencies such as CSA, UL, and TÜV.
6.1. Verification Initialization
Turn on the POWER switch located on the lower left-hand side of the front panel. The
initialization screen will appear with a message at the bottom indicating <TEST> to
verification. You now have the option to press the TEST button and activate the Verification
Menu. The option to activate the Verification expires approximately 3 seconds after power-up.
The Initialization screen will appear as follows:
6.2. Verification Menu
From the Initialization screen (First start up screen), press the TEST button.
The Verification Menu will now be displayed. From the Verification screen, four different
Verification processes may be accessed; Continuity, AC Hipot, DC Hipot, and IR.
During the Verification process, all Remote control output signals, except the Fail output, are
disabled.
Verification
^
v
Select
Continuity
AC Hipot
DC Hipot
IR
Exit

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Associated Research hypot III 3670 and is the answer not in the manual?

Associated Research hypot III 3670 Specifications

General IconGeneral
BrandAssociated Research
Modelhypot III 3670
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals