EasyManua.ls Logo

Avaya G430 - Chapter 7: Post-Installation Verification; Post-Installation Verification; Roadmap for Post Installation; Installation Testing

Avaya G430
144 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 7: Post-installation verification
Post-installation Verification
After initial configuration, it is necessary to test the installation, and remove the installation
equipment.
Roadmap for post installation
Perform these post-installation procedures in the following order using the appropriate procedure
described in this section:
1. Test the installation
2. Remove the installation equipment
Installation testing
When the installation is complete, you must perform simple tests to verify telephone and data
connectivity.
Testing data connectivity
About this task
Test data connectivity by pinging the IP address of each device to test the device’s connectivity
within the network and outside the network.
Testing telephones
Procedure
1. Make outgoing calls from the telephone.
Make sure you hear a dial tone when you pick up the receiver. Make sure you can make
both an internal (within the local network) and an external (outside the local network) call.
2. Make a call to the telephone from both within the network and outside of the network.
July 2018 Deploying and Upgrading Avaya G430 Branch Gateway 58
Comments on this document? infodev@avaya.com

Table of Contents

Avaya G430 - Chapter 7: Post-Installation Verification; Post-Installation Verification; Roadmap for Post Installation; Installation Testing