2-4
920512-768 Operator Manual Installation Verification
❑ Verify for any construction and/or installation debris, inside and
outside wash chamber, under floor gratings and on sump filters.
Clean or discard.
❑ Verify spray headers and spray header cables. All cables are
properly tightened.
❑ Verify headers travel to the top and bottom of the wash chamber
without touching top or bottom pulleys and guides. Verify proper
installation.
❑ Inspect doors for alignment and smooth movement.
❑ Verify all the protective paper has been removed from stainless
steel.
❑ Floor underneath and surrounding unit has a noncombustible
and nonslip surface, or is covered with a metal sheet extending
to the outer edges of the unit.
❑ If Ramp Accessory is present, ramp is correctly attached to
washer as specified in S
ECTION 3 of Uncrating/Installation
Instructions (P920512-767).
IMPORTANT: After a few weeks of operation, inspect unit for leaks.
Retighten all clamps and connections.