EasyManua.ls Logo

Bauer BG 25 - Rope Fasteners, Thimbles and Sockets

Bauer BG 25
183 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE
BG 25 / 2011 / 2254_BG25_en_0000498763_V01
9 - 25
9.9.3 Rope Fasteners, Thimbles and Sockets
Every 10 operating hours or daily:
Check the wire rope is firmly in place in the fitting.
With poured rope fittings, inspect for broken wires and corrosion directly where the
rope exits the fitting.
With swaged-on rope fittings, inspect for broken wires next to the fitting, cracks in
the material and firm seizure of the rope.
CAUTION
Danger of rope breaking!
If a defect is found on a rope fitting, cut off the rope end and re-fit it.

Table of Contents

Related product manuals