Thoroughly clean each crawler, track
and rollers.
Travel forward a bit with the machine
and then park it.
Using a straight rod, measure the sag
of 1 - 1.5 m length of track in midway
(see fig.): The distance from the rod to
the track should be approx. 2 3 cm.
Otherwise, the track tension must be
readjusted.