PL-6000DC/DCX Two-Post Parking Lift 42 P/N 5900273 — Rev. A6 —July 2024
2. Fill the Power Unit Hydraulic Reservoir with approximately 2.6 gal. / 10 L Hydraulic Fluid through a
clean funnel with a 60-micron filter.
The Hydraulic Fluid reservoir must be filled with Hydraulic Fluid before operation. Hydraulic Fluid
L-HV 46# is recommended; for low temperature locations use 32#. Viscosity of the Hydraulic Fluid
should be 15-46 Centistokes (cSt). ATF Dexron III is also acceptable. Biodegradable Hydraulic
Fluid may be used if it is abrasion-resistant and compatible with NBR O-Rings. Automotive Engine
Oil is prohibited. See figure below.
3. Install the ORB Fitting on the P2 Port, apply a few drops of Hydraulic Fluid to the O-ring prior to
assembling. This helps to prevent damage to the O-ring during assembly. Verify the unused
Port is plugged.
4. Connect the Hydraulic Hose from the Cylinder to the ORB fitting just installed on the Power Unit P2
Port. Verify the unused P1 Port is plugged. See figure below.