46 support@cedarsummitplay.com
Step 28: Cafe Wall Assembly
Part 1
A:Loosenthe4boltsindicatedon(2036)CafeGround,ing.28.2,thentucktheBrookridgeTarpbetweenthe
(1931)Postsand(2036)CafeGround,downtothetopofthebolts,3/4”fromtopofboard.(g.28.1and28.2)
B: Fromoutsidetheassembly,measure1-1/2”upfromthetopof(2036)CafeGround,onbothsides,andattach
tarptoboth(1931)Posts,1/2”infromtheedgeofthetarp,with2(S5)#8x1/2”PanScrews(with#8atwasher).
(g.28.2)
C:Measure1-1/2”downfromthetopofthetarpandattachtoboth(1931)Posts,1/2”infromtheedgeofthe
tarp,with2(S5)#8x1/2”PanScrews(with#8atwasher).(g.28.2)
D:Attachathird(S5)#8x1/2”PanScrew(with#8atwasher)toeachside,6-5/8”fromthersttwoscrews,as
showning.28.2.
Hardware Other Parts
Loosenthesebolts
Fig. 28.2
1931
Fig. 28.1
6 x #8 x 1/2” Pan Screw (#8 at washer)
S5
3/4”
with#8
atwasher
2036
OutsideFortView
1 x Brookridge Tarp
BrookridgeTarp
1-1/2”
1-1/2”
S5
1931
6-5/8”
6-5/8”