Disassembly / Assembly
Infusomat® Space 6.0 3 - 55EN
3.16 Checks after Repair
Procedure
1. Remove a slide clamp which may be inserted in the safety
clamp and open
safety clamp (press and engage operating le-
ver).
2. When the activities described in chapter 3.2 to 3.8 have been
performed, a visual inspection and self test are necessary.
3. Depending on the work carried out, the specific steps of the
check list for checks after rep
air must be performed (see
„Check List for Checks after Repair“ ➨ pg. 3 - 56).
As an alternative, the checks after repair may be performed
a
ccording to the check list for technical safety check (TSC)
(see „Technical Safety Check (TSC)“ ➨ pg. 5 - 1).
4. Check the flow accuracy according to the TSC if activities of
chapter 3.10 were carried out (see „Technical Safety Check
(TSC)“ ➨ pg
. 5 - 1).