EasyManua.ls Logo

BRP ROTAX 912 Series - Page 46

BRP ROTAX 912 Series
177 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BRP-Rotax
MAINTENANCE MANUAL LINE
Authorized
exceeding
Extension or exceeding of the TBO by 5% or 6 months is allowed, whichever comes first.
Shipment The shipment to an authorized ROTAX® overhaul facility must include the following:
1 Engine log book.
2
Maintenance records of the engine (i.e. all maintenance check lists, and re-
ports of operation, of maintenance, of findings and of oil analysis).
3 The engine assembly as per supply volume. Additionally all added-on parts
as in the supply volume such as filters, intake silencer, fuel pump, external
generator, sensors, ignition unit, electric starter, oil tank.
4
Indication of total engine operating hours (TSN) and where applicable, en-
gine operating hours since a previous overhaul (TSO).
NOTE
This information must be supplied to allow the service history of
components to be traced.
5
Data about the type of aircraft used.
6
Useful remarks and observations concerning the engine.
05–10–00
Page 6
January 01 2020
Effectivity: 912 Series
Rev. 0

Table of Contents

Other manuals for BRP ROTAX 912 Series

Related product manuals