BRP-Rotax
MAINTENANCE MANUAL LINE
MAINTENANCE SCHEDULE
Perform the following maintenance tasks at the intervals shown in the maintenance check list.
See Chapter 05-20-00 section 25 hr. check.
Legend: X
=
do the task
blank
=
no task required
NOTE
If the tasks 1-3 are correct continue with the maintenance schedule.
If one of the tasks 1-3 is not fulfilled, the engine must be checked and repaired in accordance with the
BRP Rotax instructions for continued airworthiness.
Points of Inspection
Interval Operating hours Chapter
Reference
Signa-
ture
* no periodic maintenance (re-
quirement after the first 25 hours
of operation)
25* 50 100 200 400 600 1000
1) General note
All (Alert) Service Bulletins are com-
plied with. If necessary to perform
these and documented.
X X X X X X X
All SI-PAC (Service Instruction Part
and Accessories) for additional
GENUINE-ROTAX® – parts and ac-
cessories used on the relevant air-
craft are complied with. If necessary
to perform these and documented.
X X X X X X X
2) Differential pressure check
Check the compression by the differ-
ential pressure method.
Test pressure________hPa (psi)
Pressure drop (% or fraction)
Cyl.
#
1 2 3 4
bar/
psi
(1
use of leaded fuel more than 30%
of operation
X
(1
X
(1
X 12–20–00
Checking
the com-
pression
Effectivity: 912 Series
Rev. 0
05–20–00
Page 9
January 01 2020