EasyManuals Logo

BRP ROTAX 912 Series User Manual

BRP ROTAX 912 Series
177 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #57 background imageLoading...
Page #57 background image
BRP-Rotax
MAINTENANCE MANUAL LINE
MAINTENANCE SCHEDULE
Perform the following maintenance tasks at the intervals shown in the maintenance check list.
See Chapter 05-20-00 section 25 hr. check.
Legend: X
=
do the task
blank
=
no task required
NOTE
If the tasks 1-3 are correct continue with the maintenance schedule.
If one of the tasks 1-3 is not fulfilled, the engine must be checked and repaired in accordance with the
BRP Rotax instructions for continued airworthiness.
Points of Inspection
Interval Operating hours Chapter
Reference
Signa-
ture
* no periodic maintenance (re-
quirement after the first 25 hours
of operation)
25* 50 100 200 400 600 1000
1) General note
All (Alert) Service Bulletins are com-
plied with. If necessary to perform
these and documented.
X X X X X X X
All SI-PAC (Service Instruction Part
and Accessories) for additional
GENUINE-ROTAX® parts and ac-
cessories used on the relevant air-
craft are complied with. If necessary
to perform these and documented.
X X X X X X X
2) Differential pressure check
Check the compression by the differ-
ential pressure method.
Test pressure________hPa (psi)
Pressure drop (% or fraction)
Cyl.
#
1 2 3 4
bar/
psi
(1
use of leaded fuel more than 30%
of operation
X
(1
X
(1
X 12–20–00
Checking
the com-
pression
Effectivity: 912 Series
Rev. 0
05–20–00
Page 9
January 01 2020

Table of Contents

Other manuals for BRP ROTAX 912 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BRP ROTAX 912 Series and is the answer not in the manual?

BRP ROTAX 912 Series Specifications

General IconGeneral
BrandBRP
ModelROTAX 912 Series
CategoryEngine
LanguageEnglish

Related product manuals