4 Start-up
4.1 Safety instructions for the initial commissioning
DANGER!
Danger to life from start-up of a defective device!
Starting up a defective device can lead to life-threat-
ening situations and cause significant property
damage.
Never commission a defective device.
Always check the power cable for damage.
4.2 Requirements at the installation location
For the humidifier to operate properly, the following must be
observed when deciding the installation location:
n Place the humidifier on a level, horizontal surface.
n Ensure air circulation. The air inlet opening and air outlet
opening must not be covered.
n Do not place the humidifier in circulation routes or in the piv-
oting range of doors.
n The clearance to other objects in the vicinity must be at least
10 cm (4 inches) at the side and at least 10 cm (4 inches) on
top.
n For optimum functionality, the device can be set up in the
vicinity of a heat source. However, the direct temperature influ-
ence should not exceed 70 °C (158 °F).
On water-sensitive flooring, additional safety measures must be
provided.
4.3 Commissioning the humidifier for the first time
Proceed as follows to commission the humidifier: