47
Technical data
and start-up
BDC546
The pre-assembled screws for the cable lugs of the power connections can be found under the service cap.
Required highside cable cross section: 70 mm²
Required lowside cable cross section: 95 mm²
Tightening torque of the screws for the cable lugs (3, 4, 5, 6): 13 Nm
Mount the cable fittings (1, 2) at the housing
Lowside tightening torque: M32 x 1.5 with 45 Nm
Highside tightening torque: M25 x 1.5 with 35 Nm
Use the union nut to mount the cables in the cable fitting. For the tightening torque, refer to the cable
specifications.