Mast, 2 Stage
PS S7.0 7110
F-code Section C-code
Version no T-code
001 OE35
263
Service Manual 1996-10-15
© BT Products
before platform raises slightly.
Retighten locknuts on chain anchors.
17.Test operation of mast and check for tight or loose
spots and reshim as needed. Check operation first
with no load, then with capacity rated load.