Service Manual 1996-10-15
22.Remove hoist from mast and lower unit to floor.
23.Install and connect battery to unit.
24.Loosen locking nuts on lift chain anchors. Adjust
nuts until both chains are free of twists and of equal
tension. Tension is correct if you can force lift
chains sideways approximately 1/2 in. to 1 in.
before lift platform raises slightly.
Retighten locknuts on chain anchors.
25.Test operation of mast by checking for tight or
loose spots and reshim if found. Check operation
first with no load, then with rated load.