Verification Time and DatePlanning Activity
Ambient temperature
Humidity
Altitude
Atmospheric contamination
Airflow
Power evaluation:
Input power type
Power receptacles
Receptacle proximity to the
equipment
Dedicated (separate)
circuits for power
redundancy
UPS for power failures
Grounding: proper wire
gauge and lugs
Circuit breaker size
Grounding evaluation:
Data center ground
Cable and interface equipment
evaluation:
Cable type
Connector type
Cable distance limitations
Interface equipment
(transceivers)
EMI evaluation:
Cisco Nexus 9508 NX-OS Mode Switch Hardware Installation Guide
138
Site Preparation and Maintenance Records
Site Preparation Checklist