3-kW AC, Universal AC/DC, or DC power supplies (AC power
supplies shown).
4Chassis LEDs1
2 vertical mounting brackets used to mount the chassis onto a
rack
5Line cards (up to 8)2
Chassis handles (used only for positioning the chassis on the
bottom support rails—do not use these handles for lifting the
chassis)
6Supervisor modules (1 or 2)3
The following figure shows the hardware features seen from the rear of the chassis (one fan tray has been
removed to show the fabric modules behind the fan trays).
Grounding pad4
Fan trays (3—left fan tray not shown in order
to display the fabric modules located behind
the fan trays)
1
Cisco Nexus 9508 NX-OS Mode Switch Hardware Installation Guide
5
Overview
Overview