EasyManua.ls Logo

CleaverBrooks CFC-1000 - Page 14

CleaverBrooks CFC-1000
314 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 1 — Introduction
1-8 Part No. 750-263
The stack can be mounted on the right (Figure 1-12) or left side on
the back of the boiler base.
The flue gas duct sizes may be reduced at the vent connection.
See also Chapter 4 - Stack and Intake Vent Sizing and Installation.
.
Figure 1-11 Outlet Temperature Sensor, Top of Pressure Vessel
Figure 1-12 Stack Right Side
(viewed from rear)

Table of Contents

Related product manuals