EasyManua.ls Logo

CleaverBrooks CFC-1000 - Page 14

CleaverBrooks CFC-1000
314 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 1 — Introduction
1-8 Part No. 750-263
The stack can be mounted on the right (Figure 1-12) or left side on
the back of the boiler base.
The flue gas duct sizes may be reduced at the vent connection.
See also Chapter 4 - Stack and Intake Vent Sizing and Installation.
.
Figure 1-11 Outlet Temperature Sensor, Top of Pressure Vessel
Figure 1-12 Stack Right Side
(viewed from rear)

Table of Contents

Related product manuals