EasyManua.ls Logo

CME BodyGuard 595 Color Vision - Charging the Pump Battery

CME BodyGuard 595 Color Vision
69 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 Installation and Set Up
BodyGuard 595Color Vision Operator Manual
20
Charging the Pump
NOTE: the pump is protected against overcharging. In order to keep your
battery fully charged, connect the pump to the mains via the Charger whenever
possible. Be sure that the battery is fully charged at all times.
Warning: if the battery is removed during operation while pump is not
connected to a charger connected to mains, the pump will turn off.
1.
Connect the charger unit to AC power and verify that the AC indicator is lit.
2.
Put the pump into the charger (top first) until it clicks into place.
3.
The battery is charging when the red battery LED on the front of the charger is
lit. The battery is fully charged when the battery LED symbol turns green. If the
led does not light or does not turn green after more than 6 hours, pls. replace
battery.
4.
Remove the pump from the charger by pressing the release button (located next
to the LED indicators on the charger), Lift the pump out of the charger bottom
first.

Related product manuals