EasyManua.ls Logo

Daewoo DE12T - Page 147

Daewoo DE12T
188 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
l. Assemble the nozzle and nozzle holder
assembly to the nozzle tester (105785-
1010).
m. Adjust the primary opening pressure to
the specified pressure using the adjusting
screw (4).
n. With a monkey wrench, fix the nozzle hold-
er securely and tighten the cap nut (SW
19mm) to specified torque.
Inspecting the needle valve for full lift
a. Install gasket (026508-1140) and plug
(157892-1600 : SW12mm) onto the adjust-
ing retaining nut (157892-1400).
- 143 -
MAINTENANCE OF MAJOR COMPONENTS
0
20
40
60
80
100
EQM4039I
EQM4040I
EQM4041I
EQM4042I
Torque 3.0 ~ 4.0 kg
.
m

Table of Contents

Related product manuals