Dene for the whole week: Click next to All. All the icon switch to . You can
dene the period for all the days simultaneously.
Dene for several days of a week: Click before each day one by one. The icon
switches to . You can dene the period for the selected days simultaneously.
2. On the timeline, drag to dene a period.
Once the time period overlaps, the recording priority is: M&A > Alarm > POS >
Intelligent > Motion > General.
Select a recording type and then click the of the corresponding date to clear
the corresponding period.
Figure 5-84 Set period by drawing
The MD record and alarm record function are both null if you enabled the
function of MD&Alarm.
●
Dene the period by editing.
1.
Select a date and then click .
User's Manual
207